Case study: bringing a 15-year-old YLM back into cycle time spec

A well-kept YLM should still be cutting to its rated cycle at 15 years old. This one had slipped 22% over three years and nobody had noticed.

The customer bought this YLM new. It had been on continuous shift work for 15 years cutting mid-run production parts. Nothing had failed. The problem was subtler: cycle time on the reference part had crept from 3:12 to 3:55 over three years and management wanted to know why.

What we found

  • Rapid rates on X and Y were down to 32 m/min from the rated 40. Servo tune had drifted with age.
  • The tool magazine was firing slower than spec. Air pressure at the ATC was at 4.9 bar, not the required 6.
  • Spindle warm-up was taking 40% longer to hit thermal equilibrium. Cooler had a slow leak.

What we did

No parts were failing, so nothing needed replacing outright. The job was tuning:

  1. Rebalanced the servo loops on X, Y and Z. Restored rapids to spec without going near the mechanical side.
  2. Replaced the ATC solenoid and repaired the air supply line. ATC time down from 4.1 s to 2.6 s per tool.
  3. Recharged the spindle cooler and replaced the flow switch. Warm-up back to under 20 minutes.

Result

Cycle time on the reference part came back to 3:16, four seconds off the day-one figure. On a run of 800 parts a shift, that is 27 minutes of recovered production per shift. Two shifts a day, 240 shifts a year: 108 hours of extra spindle time.

Written by

Codeller

On the tools with King Machine Tool Services. Writes up the jobs worth learning from.

Need this kind of thinking on your machines?

Our engineers cover breakdowns, servicing, spindles, ballscrews and installs across the UK.